Details, Fiction and site acceptance test commissioning
Soon after accumulating a ton of operational data (and checking the SOO) only then do we find a route to insure the automation works the way it really should. The final bit of That is checking the actual automation code or logic diagrams to be certain it works correct.Test the redundancy mechanism by simulating a controller failure and making sure